Construction Dust Removal
Detailed dusting and wiping of accessible horizontal and vertical surfaces included in the approved scope.
Commercial Cleaning Services
Final-detail cleaning that removes construction dust, sharpens presentation, and helps completed commercial spaces feel ready for handoff.
Commercial post-construction cleaning throughout the Bay Area and Monterey Bay.
From Completed to Ready
Construction and tenant-improvement work leave behind fine dust, surface film, labels, footprints, packaging remnants, and details that become obvious under finished lighting. A strong final clean helps the completed work present the way it was intended.
Firato Service Co., Inc. provides commercial post-construction cleaning based on project stage, remaining trade activity, surface conditions, access, utilities, handoff timing, and the exact responsibilities defined with the project team.
Commercial Final Cleaning
Each scope is built around the finished space, remaining conditions, construction schedule, and final presentation standard.
Detailed dusting and wiping of accessible horizontal and vertical surfaces included in the approved scope.
Vacuuming, mopping, machine care, or specialty cleaning selected around the new or existing finished flooring.
Cleaning for included windows, doors, sidelights, office partitions, mirrors, and compatible glass surfaces.
Cleaning of fixtures, counters, sinks, cabinets, appliance exteriors, partitions, and finished surfaces as defined.
Focused care for accessible shelving, casework, trim, baseboards, ledges, hardware, and installed fixtures.
A planned return after punch-list activity or final trades to address new dust, footprints, and handoff details.
The Firato Standard
We clarify project stage, included areas, trade activity, access, utilities, priorities, schedule, and handoff expectations.
A defined scope and sequencing plan help the team work methodically through a changing construction environment.
We stay focused on the finished presentation while remaining responsive to the realities of the project schedule.
Built Around the Project Stage
Clear Scope. Cleaner Handoff.
Post-construction conditions vary dramatically. Heavy debris, hazardous materials, active demolition, specialty restoration, high-access work, paint or adhesive removal, damaged surfaces, and manufacturer-specific treatments may require separate providers, pricing, or project review.
Before work begins, we document included areas, surfaces, exclusions, preparation responsibilities, project readiness, expected outcomes, and the timing of any final touch-up visit.
Schedule a Project WalkthroughProjects We Support
How Project Cleaning Begins
We review completion status, areas, surfaces, dust, debris, access, utilities, timing, and priorities.
We document included work, exclusions, preparation, project readiness, sequencing, expectations, and pricing.
We coordinate with the project team and work methodically through the approved areas and details.
When included, we return after final trade activity to address agreed-upon touch-up needs.
Local Reach. Local Accountability.
Firato supports commercial projects from San Francisco and Oakland through the Peninsula, Silicon Valley, Santa Clara County, San Benito County, Salinas, and Monterey.
After handoff, Firato can also help establish recurring commercial janitorial service, floor care, and window cleaning for the completed facility.
Discuss Your ProjectFrequently Asked Questions
The scope can include construction-dust removal, surface wiping, floors, carpet, interior glass, doors, restrooms, break areas, millwork, fixtures, baseboards, ledges, and final details. Every included item is defined in the proposal.
Final cleaning is most effective when dust-producing work and major trade activity are complete in the scheduled areas. The project team should provide working utilities, lighting, access, and a space ready for cleaning.
Light cleaning remnants may be addressed when included, but general construction debris, hauling, dumpsters, hazardous materials, and trade-generated waste must be specifically reviewed and assigned before service.
Yes. A defined touch-up visit can be included after punch-list work or returning trades. Timing, areas, and the extent of touch-up work should be agreed upon in advance.
Contact our team to schedule a project walkthrough. We will review completion status, conditions, surfaces, access, timing, responsibilities, and the desired handoff standard.
Ready for the Final Reveal?